Completed: September 2022
Hillside Views Sustainable New Build
Overview
The aim was to create a stunning visual masterpiece providing family function and form with amazing views over the ocean, all in a sustainable new build.
Build Specs
Sustainable New Build 262 m2
12 month build
Work completed by the Brewer Builders team included:
- Foundations consist of 3604 concrete and timber piled timber floor
- Beech cladding to the external face
- Internal natural Oak floors
- 5 double bedroom
- 2 x bathroom and en suite off the master
- Indoor, outdoor flow with the view overlooking the ocean
- Beech decking with feature balustrades
- Foundations consist of 3604 concrete and timber piled timber floor
- Beech cladding to the external face
- Internal natural Oak floors
- 5 double bedroom
- 2 x bathroom and en suite off the master
- Indoor, outdoor flow with the view overlooking the ocean
- Beech decking with feature balustrades